Elgin Pelican P Specifications Page 90

  • Download
  • Add to my manuals
  • Print
  • Page
    / 112
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 89
NOTICE
Due to the lower roll offset, clearance at the left side
will be slightly less than the clearance at the mid-
dle, and clearance at the right side will be greater.
7. If adjustment is necessary, take the following
steps.
a. Raise the conveyor.
b. Block and support the conveyor.
c. With the pistons of the conveyor lift cylin-
ders (Figure SP-20) retracted, remove the
snap ring at the bottom of each cylinder,
and remove both cylinders.
d. Add or remove an equal number of shim
washers at the rod end of each cylinder. An
equal number is used to maintain conveyor
squareness.
e. Install the cylinders and snap rings.
f. Unblock and lower the conveyor.
g. Repeat the clearance checking procedure.
SERVICE
PROCEDURES
SP-24
STOP BOLT LIFT CYLINDER
Left Side Of Conveyor
Figure SP-20
Page view 89
1 2 ... 85 86 87 88 89 90 91 92 93 94 95 ... 111 112

Comments to this Manuals

No comments